Specification | 75A*150H/180H/210H 100A*150H/180H/210H 125A*150H/180H/210H 150A*150H/180H/210H 200A*150H/180H/210H |
---|---|
Application | PP + Fire-Resistant Foam |
Performance |
In the event of a fire, it expands approximately 30 times to block heat and smoke completely. 1. No additional refractory material insertion and no breakage or fall-out. 2. Penetration sleeve self-foaming expansion safety in case of fire. 3. No additional construction cost due to fireproof filler construction and sleeve installation. 4. 50A Using Non-isolated Systems. |
Specification | 75A Sleeve Insertion Type
|
---|---|
Application | PP + Fire-Resistant Foam |
Performance |
In the event of a fire, it expands approximately 30 times to block heat and smoke completely.
1. Role of drain trap in case of pipe leak. 2. Application of kitchen, bathroom, laundry room, pipe shaft room, etc. 3. To block the unpenetrated area of the pipe. |
Specification | 1200mm*500mm*0.5mmT |
---|---|
Application | Galvanized Iron Plate 0.5T * Thermal Expansion Sheet 5T |
Performance |
In the event of a fire, it expands approximately 30 times to block heat and smoke completely. 1. Good workability. (External finish only) 2. No construction defect. (Visually identifiable) 3. Pipe penetration square perforation possible. 4. Easy to handle when modifying, supplementing, or changing penetrating materials for facilities. |
Steel fixture |
1. Very sturdy because the fixture is made of a whole steel plate.
2. Oblique net shape on the inner band to prevent slipping. 3. Can be applied to both steel pipe and PVC. |
---|---|
Special painting using steel (Electro painting) |
1. Nonflammable, no poison gas generated because it is water-based paint. 2. Applied to automobile painting. Boasts of high salt, corrosion, and water resistances derived from efficient application. |
Convenient construction |
1. Fastening bolts are fixed; only nuts should be fastened.
2. All nuts have the same specification. (fixture and sleeve) |
Application | Metallic pipe (STS, SU, SR, cast-iron pipe, copper pipe, etc.), PVC pipe |
---|---|
Specification | SU pipe : 20A, 25A, 30A, 40A, 50A, 60A, 75A, 80A, 100A Steel pipe .: 15A, 20A, 25A, 32A, 40A, 50A, 65A, 80A, 100A, 125A, 150A PVC pipe : 25A, 35A, 40A, 50A, 65A, 75A, 100A, 125A, 150A |
Feature |
1. A fire-retardant, self-extinguishing product.
2. Can be applied to both steel pipe and PVC. 3. Boasts of excellent impact/heat resistances. 4. Large pipe should be installed using bolts on both sides. 5. Small pipe should be installed using bolt on one side. 6. Slipping prevention applied inside of the fixture. (company logo is carved) 7. Thicker and higher compared to those of rival companies. |
---|---|
Convenient construction |
1. Fastening bolts are fixed; only nuts should be fastened.
2. Piping purpose is indicated by clamp color. 3. Can be installed regardless of eccentricity. 4. Installation method varies according to the pipe diameter. |
Application | PVC pipe |
---|---|
Specification | 25A, 35A, 40A, 50A, 65A, 75A, 100A |
Feature |
1. Fire prevention foam pad depth 50T + Thermal expansion tape thickness 2T.
2. Provides excellent fire prevention for contraction/expansion. 3. Semi-permanent elastic body that absorbs all external shock. 4. Can be installed easily due to elastic material. 5. Provides excellent soundproofing. 6. Applied to steel pipe less than 100A. 7. Applied to penetration sleeve less than 150A. 8. Components : Fireproof Filling Compound+Fire Prevention Sealant+Thermal Insulation Material. |
---|
Pipe size, location, and type | 100A Floor Steel Pipe | Pipe size, location, and type | 100A Wall Steel Pipe |
---|---|---|---|
Filling material | AG-ST110 (50mm) | Filling material | AG-ST110 (50mm) |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | AG-ST119 thickness on both sides 3T |
Thermal insulation material | AG-400(25t*200mm) | Thermal insulation material | AG-400(25t*200mm) |
Location of construction | One-side top construction | Location of construction | Double-sided construction |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | A-2 (Lightweight Steel Structural Walls for 2 hours) |
Feature |
1. Fire prevention foam pad depth 75T + Thermal expansion tape thickness 2T.
2. Provides excellent fire prevention for contraction/expansion. 3. Semi-permanent elastic body that absorbs all external shock. 4. Can be installed easily due to elastic material. 5. Provides excellent soundproofing. 6. Applied to steel pipe more than 125A, 150A. 7. Applied to penetration sleeve more than 200A. 8. Components : Fireproof Filling Compound+Fire Prevention Sealant+Thermal Insulation Material. |
---|
Pipe size, location, and type | 150A floor steel pipe | Pipe size, location, and type | 150A wall steel pipe |
---|---|---|---|
Filling material | AG-ST120(75mm) | Filling material | AG-ST100(50mm) |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | AG-1119 thickness on both sides 3T |
Thermal insulation material | AG-400(25t*400mm) | Thermal insulation material | AG-400(25t*300mm) |
Location of construction | One-sided top construction | Location of construction | Double-sided construction |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) |
Feature |
1. Fire prevention foam pad depth 50T + Thermal expansion tape thickness 5T.
2. Provides excellent fire prevention for contraction/expansion. 3. Semi-permanent elastic body that absorbs all external shock. 4. Can be installed easily due to elastic material. 5. Provides excellent soundproofing. 6. Applied to steel pipe more than 200A. 7. Applied to penetration sleeve more than 200A. 8. Components : Fireproof Filling Compound+Fire Prevention Sealant+Thermal Insulation Material |
---|
Pipe size, location, and type | 400A floor steel pipe | Pipe size, location, and type | 400A wall steel pipe |
---|---|---|---|
Filling material | AG-ST130(50mm) | Filling material | AG-ST230(50mm) filling on both sides |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | AG-1119 thickness on both sides 3T |
Thermal insulation material | AG-400 (bottom 25T*400mm 2 layers) / (top 25T*400mm 1 layers) | Thermal insulation material | AG-400(38T*400mm) |
Location of construction | Top construction | Location of construction | Double-sided construction |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | A-2 (Lightweight Steel Structural Walls for 2 hours) |
Feature |
1. Fire prevention foam pad depth 50T + Thermal expansion tape thickness 11T.
2. Provides excellent fire prevention for contraction/expansion. 3. Semi-permanent elastic body that absorbs all external shock. 4. Can be installed easily due to elastic material. 5. Foamed 20-30 times in the event of fire. (penetration part is sealed) 6. Provides excellent soundproofing. 7. Applied to PVC pipe less than 200A. (to be tested for 300A) 8. Components : Fireproof Filling Compound+Fire prevention sealant. |
---|
Pipe size, location, and type | 100A floor PVC | Pipe size, location, and type | 150A floor PVC |
---|---|---|---|
Filling material | AG-PF210(50mm) | Filling material | AG-PF210(50mm) |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | AG-1119 thickness on both sides 3T |
Thermal insulation material | X | Thermal insulation material | X |
Location of construction | One-sided top construction | Location of construction | One-sided top construction |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) |
Pipe size, location, and type/th> | 200A floor PVC | Pipe size, location, and type | 300A floor PVC (To be tested) |
---|---|---|---|
Filling material | AG-PF210(50mm) | Filling material | (To be tested) |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | (To be tested) |
Thermal insulation material | X | Thermal insulation material | (To be tested) |
Location of construction | Top and bottom construction | Location of construction | (To be tested) |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | (To be tested) |
Feature |
1. Fire prevention foam pad depth 75T+Thermal expansion tape 6T.
2. Provides excellent fire prevention for contraction/expansion. 3. Semi-permanent elastic body that absorbs all external shock. 4. Can be installed easily due to elastic material. 5. Foamed 20-30 times in the event of fire. (penetration part is sealed) 6. Provides excellent soundproofing. 7. Applied to PVC pipe less than 100A. 8. Components : Fireproof Filling Compound+Fire Prevention Sealant. |
---|
Feature |
1. Fire prevention foam pad depth 75T+Thermal expansion tape 6T.
2. Provides excellent fire prevention for contraction/expansion. 3. Semi-permanent elastic body that absorbs all external shock. 4. Can be installed easily due to elastic material. 5. Foamed 20-30 times in the event of fire. (penetration part is sealed) 6. Provides excellent soundproofing 7. Applied to PVC pipe less than 200A. (to be tested for 300A) 8. Components : Fireproof Filling Compound+Fire Prevention Sealant |
---|
Pipe size, location, and type | 100A wall PVC | Pipe size, location, and type | 200A wall PVC |
---|---|---|---|
Filling material | AG-PW230(50mm) | Filling material | AG-PW210(50mm) |
Fire prevention sealant | X | Fire prevention sealant | AG-1119 thickness on both sides 3T |
Thermal insulation material | X | Thermal insulation material | X |
Location of construction | One-sided construction | Location of construction | Double-sided construction |
Structure grade | A-2(Lightweight Steel Structural Walls for 2 hours) | Structure grade | A-2(Lightweight Steel Structural Walls for 2 hours) |
Feature |
1. Main ingredient of fireproof filling compound structure for facility¡¯s penetration part, used in various specifications.
2. Provides consistent expansion performance in the event of fire with advanced technical skills and high quality. 3. Expands up to 30 times in the event of fire to prevent flame, smoke, and gas by sealing the penetration part tightly. 4. Maintains excellent durability under various circumstances. |
---|
Pipe size, location, and type | 100A floor steel pipe (after heat insulation) | Pipe size, location, and type | 200A floor steel pipe (after heat insulation) |
---|---|---|---|
Filling material | AG-200 (expansion tape thickness 5T+depth 50mm) | Filling material | AG-200 (expansion tape thickness 6T+depth 75mm) |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | AG-1119 thickness 3T |
Thermal insulation material | AG-400(25t*200mm) | Thermal insulation material | AG-400(25t*400mm) |
Location of construction | One-sided top construction | Location of construction | One-sided top construction |
Structure grade | C-2(Lightweight foam concrete wall for 2 hours) | Structure grade | C-2(Lightweight foam concrete wall for 2 hours) |
Pipe size, location, and type | 400A floor steel pipe (after heat insulation) | Pipe size, location, and type | 200A floor steel pipe (after heat insulation) |
---|---|---|---|
Filling material | AG-200 (expansion tape thickness 10T+depth 100mm) | Filling material | AG-200 (expansion tape thickness 5T+depth 50mm) |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | AG-1119 thickness 3T |
Thermal insulation material | AG-400 (bottom 38t*400mm, top 25t*400mm) | Thermal insulation material | AG-400 (25t*400mm) |
Location of construction | One-sided top construction | Location of construction | Double-sided construction |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | A-2 (Lightweight Steel Structural Walls for 2 hours) |
Pipe size, location, and type | 200A wall steel pipe (after heat insulation) | Pipe size, location, and type | 400A wall steel pipe (after heat insulation) |
---|---|---|---|
Filling material | AG-200(6t*75mm) | Filling material | AG-200(10t*50mm) |
Fire prevention sealant | AG-1119 thickness on both sides 3T | Fire prevention sealant | AG-1119 thickness on both sides 3T |
Thermal insulation material | AG-400(25t*300mm) | Thermal insulation material | AG-400(25t*400mm) |
Location of construction | Double-sided construction | Location of construction | Double-sided construction |
Location of construction | A-2 (Lightweight Steel Structural Walls for 2 hours) | Location of construction | A-2 (Lightweight Steel Structural Walls for 2 hours) |
Structure of facility¡¯s penetration part | Sleeve specification | Filling material model name | AAG-200 specification (applied thickness) |
---|---|---|---|
Metallic pipe floor | 150A less than | ST110 | 2T |
Metallic pipe floor | 200A | ST120 | 2T |
Metallic pipe floor | AG-400(25t*400mm) | ST130 | 5T |
Metallic pipe floor(fixture) | 150A less than | ST1100 | 5T |
Metallic pipe wall | 250A more than | ST230 | 5T |
PVC pipe floor | 125A less than | PF210 | 10T |
PVC pipe floor | 150A more than | PF210 | 18T |
PVC pipe floor(fixture) | 125A less than | PF2200 | 10T |
PVC pipe wall | 125A less than | PW230 | 5T |
PVC pipe wall | 150A more than | PW210 | 18T |
After heat insulation | - | AG200 | 5T |
Specification | 125A~250A, 300A~350A, 400A |
---|---|
Socket | 125A~250A(O), 300A~350A(O), 400A(-) |
Heat insulation | 125A~250A(Uninsulated heat), 300A~350A(25T*600), 400A(Overall heat insulation) |
Feature |
1. Specification : 600*15*75T / 600*30*75T / 600*60*75T
2. Provides excellent fire prevention for contraction/expansion. 3. Semi-permanent elastic body that absorbs all external shock. 4. Can be installed easily due to elastic material. 5. Provides excellent soundproofing. 6. Components : Fireproof Filling Compound+Fire Prevention Sealant+Thermal Insulation Material. |
---|
Pipe size, location, and type | Duct floor | Pipe size, location, and type | Duct wall |
---|---|---|---|
Filling material | AG-DU100(75mm) | Filling material | AG-DU100(75mm) |
Fire prevention sealant | AG-1119 thickness 3T | Fire prevention sealant | AG-1119 thickness on both sides 3T |
Thermal insulation material | AG-400(38T*400mm) | Thermal insulation material | AG-400(38T*400mm) |
Location of construction | Top and bottom construction | Location of construction | Double-sided construction |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | A-2 (Lightweight Steel Structural Walls for 2 hours) |
Pipe size, location, and type | Duct floor (after heat insulation) | Pipe size, location, and type | Duct wall (after heat insulation) |
---|---|---|---|
Filling material | AG-200 (thickness 11T+depth 50mm) | Filling material | AG-200 (thickness 11T+depth 50mm) |
Fire prevention sealant | AG-1119 thickness 2T | Fire prevention sealant | AG-1119 thickness 2T |
Thermal insulation material | AG-400(25T*400mm) | Thermal insulation material | AG-400(25T*400mm) |
Location of construction | Top and bottom construction | Location of construction | Double-sided construction |
Structure grade | C-2 (Lightweight foam concrete wall for 2 hours) | Structure grade | A-2 (Lightweight Steel Structural Walls for 2 hours) |